Single Hole Bathroom Faucet, Chrome With Brass Construction, Delay Function For Water Saving

399,00 DKK
FREE Shipping

Single Hole Bathroom Faucet, Chrome With Brass Construction, Delay Function For Water Saving

  • Brand: Unbranded
Sold by:

Single Hole Bathroom Faucet, Chrome With Brass Construction, Delay Function For Water Saving

  • Brand: Unbranded

399,00 DKK

Save 475,00 DKK (54%)

RRP

874,00 DKK
In stock
FREE Shipping
Sold by:

399,00 DKK

Save 475,00 DKK (54%)

RRP

874,00 DKK
In stock
FREE Shipping

We accept the following payment methods

Description

Solid Brass Durability: Crafted from solid brass with a glossy chrome coating, this faucet ensures corrosion resistance and a long service life. Easy Installation Experience: Enjoy hassle-free setup with our faucet, which includes all necessary accessories and straightforward instructions. Medical Environment Friendly: The medical handle design is perfect for public spaces and hospitals, offering both functionality and hygiene. Water Saving Efficiency: Featuring a self-closing mechanism with a delay function, this faucet helps save water and reduces utility bills. Durable & Long-lasting: Metal construction guarantees maximum durability and corrosion resistance, ensuring years of reliable use. Experience the blend of elegance and functionality with our Chrome-plated, single-hole bathroom faucet. Perfectly designed for your ComfortZone, it combines modern aesthetics with practicality.
  • Brand: Unbranded
  • Category: Faucets
  • Fruugo ID: 381915617-822961275
  • EAN: 8583978937582

Product Safety Information

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Safety Warnings: WARNING: Beware of hidden hazards in walls or other mounting surfaces

Delivery & Returns

Dispatched within 24 hours

  • STANDARD: FREE - Delivery between Fri 14 November 2025–Tue 25 November 2025 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Yang Yue
  • Lixian Penghui Trading Co., Ltd.
  • Group 5,Renhe Village
  • Changde City
  • CN
  • 415500
  • huyaoxiaohongnianga@outlook.com
  • +1(319)277-0024

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • eVatmaster Consulting GmbH
  • eVatmaster Consulting GmbH
  • Raiffeisen Street2 B1l
  • Rodgau
  • DE
  • 63110
  • contact@evatmaster.com
  • +49 61062699873